|


Step 2. Following the
manufacturer’s directions, install a bead of construction adhesive just
inside the guidelines on the ceiling and the walls. |
|


Step 3. Press the molding
into the beads of adhesive, and attach it with finishing nails driven
through the front of the molding into the wall studs behind. |
|


Step 4. Where the molding
sections meet, fill any gaps using latex caulk. Smooth the bead with a
putty knife, and remove any excess caulk. Finish up by painting the trim
boards (inset). |