|


Step 10. Use 8d finishing
nails to attach the stool to the window jamb or sill. Before driving
the nails, put a level on the stool to check for level and flatness.
If necessary, shim the stool with cedar shingles. |
|


Step 11. Once the stool
is level and nailed to the sill, drill pilot holes in both horns,
and nail them to the wall framing using 8d or 10d finishing nails. |
|


Step 12. Hold a piece of
leg casing on top of the stool and against the jamb. Mark a cut line
at the top of the casing that is flush with the under side of the
head jamb. Cut and nail the casing. |