|


Step 2. Use an electronic stud finder to locate all the studs and joists
that will fall under the new drywall. Mark the floor, ceiling, and walls
where appropriate to indicate where the framing members are. |
|


Step 3. Apply construction adhesive to the back of the panels to improve
the bond with the ceiling and walls. Use a wavy bead in a 8-to 12-in,
grid. Once this glue is in place, handle the panel with care to avoid
smearing the glue on your tools, yourself, and other surfaces. |