Step 2. Once the bottom plates are installed, establish the location of
the top plates so they will be plumb with the bottom plates. To do this,
hold a stud on the bottom plate so the edges of both are flush. Then
hold a level to the side of the stud, and move the stud until it’s
plumb. Mark the ceiling at this point. |
|


Step 3. Add a stud between the bottom and top plates until the wall is
framed. Preassemble a 3.stud corner, and nail it between the plates.
This corner post should be plumb in both directions. |